Sketch plans for Union College Stage Five
- UQFL117-Series A-Subseries 13-File 20
- File
- 1972-1973
Part of James Birrell Papers
The construction of Stage 5 commenced in Jan 1973 and was completed Mar 1974. This file has the sketch plans for stage five of Union College. From the title block creator is James Birrell & Partners (Architects and Town Planners). All are ink line drawings on tracing paper. The drawings are:
[Item 1] 'Sketch plan floor levels r.l. 74'0" & r.l. 83'0"', no job/sheet number, Sep 1972 (previously numbered A15.223).
[Item 2] 'Sketch plan floor levels r.l. 92'0"', no job/sheet number, Sep 1972 (previously numbered A15.224).
[Item 3] 'Sketch plan floor levels r.l. 74'0" & r.l. 83'0"', no job/sheet number, Mar 1973 (previously numbered A15.225).
[Item 4] 'Sketch plan floor levels r.l. 92'0"', no job/sheet number, Mar 1973 (previously numbered A15.226).
James Birrell and Partners