Job no. B7.B Agriculture and Entomology Building Stage Three
- UQFL117-Series A-Subseries 14-File 6
- File
- 1970
Part of James Birrell Papers
The Agriculture and Entomology Building was built in three stages. This file comprises three working drawings for Stage 3 and two other drawings. The working drawings have the job number of B7.B; are ink line drawings on tracing paper; have the title block with the client as The University of Queensland, St. Lucia for the Co-ordinator General of Public Works; have a running sequential drawing number from 1 to 3; and the architect is James Birrell and Partners. Working drawings are:
[Item 1] Plans, Sections, and Details; Job/drawing no. B7.B/W, dated 8 Oct 1970 (previously numbered A16.96);
[Item 2] Elevations, Job/drawing no. B7.B/W1, undated (previously numbered A16.37);
[Item 3] 'Elevations', Job/drawing no. B7.B/W2, undated (previously numbered A16.40).
Two additional drawing are:
[Item 4] Detail section, Location plan; ink line drawing on tracing paper; dated 29 Dec 1970 (no prior number); and
[Item 5] 'Hatch to roof in ceiling of north fire escpae : The Agriculture and Entomology Building'; ink line drawing on tracing paper; undated (no prior number)
James Birrell and Partners