Print preview Close

Showing 196 results

Archival description
James Birrell Papers
Advanced search options
Print preview View:

Diagrammatic layout, underfloor service ducts

Diagrammatic layout of underfloor service ducts for the J. D. Story Administration Building, line drawing in ink on tracing paper, undated. Same as colour drawing in bound presentation volume.

Birrell, James, 1928-

Drawing No. 1244 Union College - Stage 1, University of Queensland

The construction of Stage 1 commenced on 26 June 1964 and was completed in May 1965. 1 volume of 22 drawings, with cover page and contents page, held together metal paper binders and staples. From cover page creators are J.P. Birrell (University Architect) and Antony Tod (Consulting Structural Engineer). All drawings are dated April 1964. The first page has the drawing index and general notes. Drawings all have the number 1244, followed by a running sheet number from 1 to 22.

Birrell, James, 1928-

Drawing no. 1505 University of North Queensland First Hall of Residence

1 volume of plans by James Birrell (University Architect) and Antony Tod (Consulting Structural Engineer); cover page has a drawing index; sheets numbered sequentially from 1 to 31 with numbers 17 and 27 missing. Previously held together with metal paper binders (now removed).

Birrell, James, 1928-

Drawing No. 1712 Union College - Stage II, University of Queensland

The construction of Stage II commenced in May 1965 and was presumably completed before the start of first term in 1966. 1 volume of 7 drawings, with cover page, held together metal staples. From cover page creators are James Birrell & Partners (Architect) and Antony Tod (Consulting Structural Engineer). All drawings are dated March 1966. Drawings all have the number 1712, followed by a running sheet number from 1 to 7.

James Birrell and Partners

Drawing no. 1998 The Library - University College of Townsville

1 volume (24 pages) with 23 plans; Mar 1967 on two of the plans; sequentially numbered 1-29 (missing 17 and 21-24); Architect - James Birrell and Partners; Consulting Structural Engineer - Antony Tod and Partners; Drawing index and general notes on sheet no. 1; previously held together with metal paper binders. Three additional plans not bound in the set for sheet no.s 15 - 17, dated Apr 1967.

James Birrell and Partners

Drawing No. 2221 Union College - Stage III, University of Queensland

The construction of Stage III commenced in July 1967 and was completed in June 1968. This volume comprises 13 drawings and a general notes page. It was previously held together metal staples. From cover page creators are James Birrell & Partners (Architect) and Antony Tod & Partners (Consulting Structural Engineer). All drawings are dated June 1967. General notes page and all drawings have the drawing no. number 2221, followed by a running sheet number from 1 to 14.

James Birrell and Partners

Drawing No. 3093 Union College - Stage IV, University of Queensland

The construction of Stage IV commenced in December 1969 and was completed inJune 1972. This volume comprises 10 drawings and a general notes page. It was previously held together metal staples. From cover page creators are James Birrell & Partners (Architect) and Antony Tod & Partners (Consulting Structural Engineer). All drawings are dated October 1969. The General notes page is undated November 1960. General notes page and drawings have the drawing no. number 3093, followed by a running sheet number from 1 to 11.

James Birrell and Partners

Drawing No. 4102 Union College - Stage five

The construction of Stage V commenced in Jan 1973 and was completed in Mar 1974. This volume comprises 8 drawings. It is held together metal staples, with pages coming loose. From title block creators are James Birrell & Partners (Architect) and Antony Tod & Partners (Consulting Structural & Civil Engineers). All drawings are dated Oct 1972. Drawings have the drawing no. number 4102, followed by a running sheet number from 1A to 8.

James Birrell and Partners

Drawing no. T106 Lighting and fire plans

1 volume (13 plans); undated; sequentially numbered T106/E1-T106/E8 and T106/F1-T106/F5; Architect - James Birrell and Partners (Brisbane and Port Moresby); Consulting Mechanical and Electrical Engineers - P.R. Scott & Associates; previously held together with metal staples.

James Birrell and Partners

Results 31 to 40 of 196