Print preview Close

Showing 274 results

Archival description
Subseries
Advanced search options
Print preview View:

Job A1 Renovations to Main Building, University of Queensland

10 plans, ink line drawings on tracing paper, for renovations to Main Building (now known as Forgan Smith Building). Stage 1 comprises 5 drawings for the Law and the Thomas Thatcher Memorial Libraries with drawing numbers A1/54 to A1/58, dated Aug to Sep 1965. The Thatcher Library, established in 1948, provided services for distance education and closed in 1993. Stage 2 comprises 3 drawings for the area between the Library and Arts entrance with drawing numbers A1/59 to A1/61. There is a plan for the Language laboratory which has no job number or details in title block. The final plan is Job A1/32 Proposed mezzanine floor to printery (Library basement): Architectural plan, ink line drawing on tracing paper, 38 x 70 cm; title block has University Architect J.P. Birrell; Job/drawing number A1/32; no date.

The Shapcott press was on the lower ground floor of Main Library. During the extension to Main Library there was discussion that the printery could be housed on the bottom floor of the Main Building. This last plan seems to reflect that idea. When Main Library was extended the Printery was moved to the Industrial Centre Building, located on the corner of Services Road and Hood Street.

Birrell, James, 1928-

J.D. Story Building, University of Queensland

Prior to the construction of the J.D. Story Administration Building, University administration facilities had been housed within Main Building (now know as the Forgan Smith Building). Main Building had undergone many alterations in response to the changing needs of the university administration. In 1959 the Senate decided a new Administration Building should be built. Other building priorities delayed designs being drawn up. In 1962 plans were submitted to the Australian Universities Commission (A.U.C.). Changes requested by the A.U.C. delayed construction which was to be a two stage process: Stage One was completed in October 1965 and Stage Two in October 1966. Plans include: site plans, window details, detail of senate table, floor plans, electrical services plans, roof plans.

There are 6 volumes (sets/presentation volume/office copy sets) with plans as well as individual plans; the total number of plans for this building in this subseries are 281. Not all have been created by James Birrell.

Jane Eyre [Libretto]

'Jane or The Bride of Thornfield' (Jane Eyre), typescript, 18 leaves, a few emendations. [David Malouf’s 2017 note: First draft, 1996/8. Performed Cheltenham Festival. Toured London, Canberra, St Louis, USA.]. With associated letter by Malouf to Michael Berkeley. Accompanied by the published libretto, Jane Eyre, from cover 'A libretto by David Malouf for an opera by Michael Berkeley', 27 pages, published by Vintage in 2000.

Malouf, David, 1934-

Jack Maggs [novel] (1997)

Working titles for the novel Jack Maggs include 'Mags', 'The Old Dart' and 'The Somnambulist'. This subseries includes drafts (complete and incomplete), off-cuts, proofs and research material. Jack Maggs was winner the Age Book of the Year Award for Fiction 1997, Commonwealth Writers Prize 1998, and the Miles Franklin Award 1998.

Interviews

This subseries is comprised of interviews with Judith Rodriguez.

Results 131 to 140 of 274