Showing 3096 results

Archival description
File
Advanced search options
Print preview View:

South eastern region of Chemistry Building, University of Queensland [Unbuilt]

The proposed Chemistry Annex was to be situated along Circular Drive (now Staff House Road) sitting in a small vacant piece of land adjacent to two wings of the Chemistry building, beside the bookshop, about where the current Global Change Institute sits. These three plans are of the existing chemistry building and are dated, 3rd, 5th and 7th October 1964.

Southbank - South Brisbane

Bound curriculum vitae with photographs of major works; elevation and section drawings for Southbank proposal; unbound master copy of Southbank proposal including photographic negatives; answers to questions from South Bank Corporation; bound copies of Southbank submissions

Southbank and New Southbank, South Brisbane

66 drawings relating to the redevelopment of the Expo 88 site at South Brisbane. Some of the drawings carry the job title 'Southbank', others are titled 'New Southbank'. They include concept plans and sketches, site plans and elevations. Unnumbered job.

Southeast Queensland Flood Solutions

Original folder titled ‘D’Aguila Dam’ ‘Bris Flood’. Correspondence, photographs, maps, newspaper cuttings and pamphlets relating to the Queensland Plan, and de Gruchy’s D’Aguilar Range water/power plan, 2007 to 2014.

Southport Spit Study, Gold Coast

Project no. 06.83 Philip Park. One cover sheet + 5 architectural drawings (Master plans). From the Title Block: The Heather Thiedeke Group, architects and planners. Client: Gold Coast City Council. Brief: Provide local councillor Athol Patterson with a master plan to settle divergent opinions on the future of the Spit. The proposal established an ocean parkland with controlled public access to a series of beaches, picnic areas and local carparking, health and exercise zones were connected by a pathway for pedestrians and separate bike ways. The length of the path was divided into modules of a marathon course. Commercial zones were restricted to the existing areas of development at the southern end of the Spit.

Project no. 06.82 Nerang River Entrace Landscaping. One cover sheet + 4 architectural drawings (Schematic designs). From the Title Block: The Heather Thiedeke Group, architects and planners. Client: Gold Coast Waterways Authority. Designs for the North end entrance.

Thiedeke, Graeme, 1942-

Soviet tests

Correspondence between Ross Gwyther and the Department of Defence about missile tests in the Pacific by the Soviet Union, and copies of journal articles about Soviet and US navy activities in the Pacific.

Spare Rooms for Refugees

Beige manila folder with contact details written on the cover containing:
Document listing refugee support contacts and list of 'Spare Rooms for Refugees' volunteers;
Printed pages from 'Spare Rooms for Refugees' website, 4 Feb 2004;
Emails to Kate Durham and Julian Burnside, 8 Feb 2002 to 11 Feb 2004, 27 leaves;
Letter to Kate Durham from Howard Glenn, A Just Australia, 28 Jan 2004, 2 leaves;
Copy of facsimile to Russell Skelton from Kate Durham, 22 Feb 2002, 1 leaf;
Original and copy of facsimile to Denis Nihil from Sr Mary Mackin, 15 Sept 2003, 7 leaves;
Printed pages of contacts for 'Spare Rooms for Refugees' volunteers;
Printed pages from document Senate Select Committee – Children Overboard Affair, 21 Aug 2002;
Copies of facsimile document regarding Topside camp, Nauru, 11 Mar 2002;
Copies of newspaper articles: 'Island of no Hope' The Dominion Post, 3 Jan 2004 and ‘Pacific Confusion’ The Australian, [undated];
Handwritten letter to Alan Montague from Kate Durham [undated];
Flyers regarding Spare Rooms for Refugees;
Invitation to welcome newest arrivals from Nauru.

Results 2701 to 2710 of 3096