Showing 202 results

Archival description
Vibert McKirdy Brown Architectural Drawings
Advanced search options
Print preview View:

Proposed extra storage Atherton Maize Pool Board : longitudinal section through bins and headhouse at Atherton silos

Architectural plan of proposed extra storage for Atherton Maize Pool Board at Atherton. Comprises: longitudinal section through bins and headhouse. No scale. Signed: "V.M. Brown. Architect. Atherton. 23/9/32." The plans for the extension were approved by the Public Works Department. John Doyle of Cairns was accepted for the construction of the six new silos at Atherton, which were completed in under seven days.

Proposed extra storage Atherton Maize Pool Board : railway elevation

Architectural plan of proposed extra storage for Atherton Maize Pool Board at Atherton. Comprises: Railway elevation. Scale 1/8" = 1'. Unsigned. Undated. The plans for the extension were approved by the Public Works Department. John Doyle of Cairns was accepted for the construction of the six new silos at Atherton, which were completed in under seven days.

Proposed extra storage Atherton Maize Pool Board : plans

Architectural plan of proposed extra storage for Atherton Maize Pool Board at Atherton. Comprises: plan of silo top and ground plan of silos. Scale 1/8" = 1'. Unsigned. Undated. The plans for the extension were approved by the Public Works Department. John Doyle of Cairns was accepted for the construction of the six new silos at Atherton, which were completed in under seven days.

Concrete and steel details Atherton silos : sheet no. 4

Architectural plan of concrete and steel details Atherton silos. Comprises: Section through tunnel, Detail of R.C. beam, Detail of beam and silo top, detail of ties to headhouse, Plan of elevator tower, Section through silos, Detail of bin bottom, Detail of bin intersection and Section through tunnel and hopper. Scales 1/8", 1/4" and 1/2" = 1'. Signed: "V.M. Brown. A.R.A.I.A. Architect. Atherton. The plans for the extension were approved by the Public Works Department. John Doyle of Cairns was accepted for the construction of the six new silos at Atherton, which were completed in under seven days.

Non-habitable buildings for the Atherton Tablelands Maize Board

The Atherton Maize Board (Pool) was constituted on 31 August 1923 and was responsible for the marketing of maize produced in Atherton, Mareeba, Herberton, Chillagoe and adjacent areas. New Silos at Atherton and Tolga were completed in 1925 and by 1931 addtional storage was required. This series has plans for silo storage in Tolga, Kairi, and Atherton.

Results 11 to 20 of 202