Showing 202 results

Archival description
Vibert McKirdy Brown Architectural Drawings
Advanced search options
Print preview View:

Concrete and steel details Atherton silos : sheet no. 4

Architectural plan of concrete and steel details Atherton silos. Comprises: Section through tunnel, Detail of R.C. beam, Detail of beam and silo top, detail of ties to headhouse, Plan of elevator tower, Section through silos, Detail of bin bottom, Detail of bin intersection and Section through tunnel and hopper. Scales 1/8", 1/4" and 1/2" = 1'. Signed: "V.M. Brown. A.R.A.I.A. Architect. Atherton. The plans for the extension were approved by the Public Works Department. John Doyle of Cairns was accepted for the construction of the six new silos at Atherton, which were completed in under seven days.

Proposed extra storage Atherton Maize Pool Board : plans

Architectural plan of proposed extra storage for Atherton Maize Pool Board at Atherton. Comprises: plan of silo top and ground plan of silos. Scale 1/8" = 1'. Unsigned. Undated. The plans for the extension were approved by the Public Works Department. John Doyle of Cairns was accepted for the construction of the six new silos at Atherton, which were completed in under seven days.

Proposed extra storage Atherton Maize Pool Board : railway elevation

Architectural plan of proposed extra storage for Atherton Maize Pool Board at Atherton. Comprises: Railway elevation. Scale 1/8" = 1'. Unsigned. Undated. The plans for the extension were approved by the Public Works Department. John Doyle of Cairns was accepted for the construction of the six new silos at Atherton, which were completed in under seven days.

Proposed extra storage Atherton Maize Pool Board : longitudinal section through bins and headhouse at Atherton silos

Architectural plan of proposed extra storage for Atherton Maize Pool Board at Atherton. Comprises: longitudinal section through bins and headhouse. No scale. Signed: "V.M. Brown. Architect. Atherton. 23/9/32." The plans for the extension were approved by the Public Works Department. John Doyle of Cairns was accepted for the construction of the six new silos at Atherton, which were completed in under seven days.

Plan of proposed hopper and elevator tower at silos, Kairi, Maize Pool Board. F.G. Winzar. Mgr.

Architectural plan of proposed hopper and elevator tower at silos in Kairi for Maize Pool Board Manger, F.G. Winzar. Scale 1/8" and 1/2" = 1'. Includes: section of hopper and pit, plan of pit and hopper, elevation of tower, plan of cut off, side elevation of tower and elevator pit, general plan, detail of slide, and section of hopper and schute to pit. Signed: "V.M. Brown. A.R.A.I.A. Architect. Atherton. 3/7/31." The Kairi Maize Silos are the only surviving cluster silo complex on the Atherton Tableland and were heritage listed in 2007.

Results 1 to 10 of 202